Installation of point drainage

Installation of point drainage
  • Define which drain hole corresponds to the tube that is to be joined. With the help of sharp chisel or high-strength screwdriver free the flared-end from filling material. To join to the flared-end of the tube 100-mm wide use a connector included in the set. The connector is suitable only for flared-end marked with inscription "USCITA".
  • Place the inlet in the floor and join drain pipe.
  • Fill the floor with wet concrete up to the upper edge of the tube and tamp the concrete.
  • Make sure, that the surface near drainage system is 3-5 mm higher than its edge.
  • To compensate horizontal force, which appears by installation at installation of the drainage in the concrete tank or inside of reinforced concrete structures, it is necessary to provide for lengthwise and transverse compensating joints.
  • Mount the appropriate cover. If you asphalt surface, it is necessary to make 10 mm gap around the drainage.
  • After installation of the drainage in the paved, asphalt or concrete surface the gap around it should be filled with gravel, sand or bitumen.
Installation of drain box

Installation of inlet well

Installation of inlet well